At the 2016 Air Force Association’s Air, Space and Cyber Conference, then-Secretary of the Air Force Deborah Lee James announced the B-21 would be named “Raider” alongside Lt. Col. Dick Cole, the last surviving airman from the famous Doolittle Raid. The Raider is one part of the U.S. Department of Defense’s (DoD’s) efforts to modernize all three legs of America’s nuclear triad – which also silo-launched nuclear ballistic missiles and submarine-launched warheads.
The Air Force’s plan initially includes at least 100 B-21s, with potential calls from defense analysts to double that number. The first operational Raiders are expected to enter service in the mid-2020s, with Ellsworth Air Force Base selected as the preferred main operating base. Yet, it was reported last year that Air the Force is unlikely to have significant numbers of the B-21 in the coming decade. The Air Force expects to have between 24 and 30 operational Raiders in that timeframe.
According to Colonel Mark Gunzinger, United States Air Force (Retired), director of future concepts at the Mitchell Institute for Aerospace Studies, part of the Air & Space Forces Association industry group, warned last year that the current Department of Defense (DoD) plan is to have a bomber fleet of 133 aircraft by 2033 – lower even than the current 141 B-1, B-2 and B-52 Stratofortress bombers now in service, which is already smaller than at almost any time in the history of the Air Force.
Despite the Pentagon’s approval for low-rate initial production, financial hurdles have surfaced. Northrop Grumman, the manufacturer of the B-21, incurred a substantial $1.56 billion charge related to cost overruns.
William LaPlante, the undersecretary of defense for acquisition and sustainment, said in a statement to reporters that he approved low-rate production for the Northrop Grumman-made stealth bomber last fall after observing the results of its ground and flight tests. LaPlante also said the B-21 team’s “mature plans for manufacturing” contributed to his decision to move forward on production.
Relevant articles:
– The B-21 Raider Has One Big Problem It Can’t Shake: Numbers, The National Interest, Jan 17, 2024
– B-21 Raider Frequently Asked Questions, northropgrumman.com
– Cost overruns on B-21 development generate $1.5bn charge for Northrop, flightglobal.com
– Pentagon OKs B-21 for low-rate production after successful tests, Defense News